Panjshir Parande power dam work completed by 98%

HOA
By HOA
2 Min Read

Panjshir local officials say the construction of Parande power dam has progressed by 98 percent and will be completed and put into operation soon.

Panjshir governor Mohammad Agha Hakim stated that the work of this dam with the capacity to produce four megawatts of electricity will be completed in the near future.

Agha Hakim added the construction work of this dam will cost more than seven million dollars and all its costs will be paid from the budget of the Islamic Emirate.

“The total cost of Parande power dam project is 7.6 million dollars, of which 7 million has been paid and 0.6 million is left, which will be paid after the completion of the work,” he added.

“Afghans have many problems; they have a lot of needs. One of their problems is the lack of electricity in villages and markets,” he added. “The Islamic Emirate pays special attention to providing its people with domestic electricity.”

Panjshir residents, meanwhile, said that the construction of this dam was important to solve lack of the electricity and they added that with the completion of this project, the electricity problems of the people of Panjshir will be completely resolved.

TAGGED:
Share This Article
Leave a Comment

Leave a Reply

Your email address will not be published. Required fields are marked *